Annexure II[See Rule 13(2)] Authorisation for Maintenance, Inspection and Testing of Lifts or Escalators.
1 Requirements for authorization.
An application for authorization for maintenance, inspection and testing of lifts or escalator, as the case may be, under the provisions of rule 13 of The Tamil Nadu Lifts and Escalators Rules, 1997 may be made in the prescribed Form-“J” along with the prescribed fee, fulfilling the following criteria.
(i) shall have an independent office premises with an independent telephone connection within the State of Tamil Nadu.
(ii) shall have to produce a certificate from any nationalized bank to the effect that he is solvent to the extent of rupees three lakhs.
(iii) shall have in his regular employment following the minimum staff (copies of appointment letter, proof of academic qualification and field of experience to be enclosed).
(a) At least one engineer possessing (a) a degree in mechanical engineering or its equivalent qualification from the recognized university or institution and having an experience of at least five years in the field of elevators or escalators, as the case may be or (ii) a diploma in mechanical engineering from a recognized Institute and having an experience of at least eight years in the field of elevators or escalators as the case may be.
(b) At least one engineer possessing (i) a degree in electrical and electronics engineering or its equivalent qualification from the recognized university or institution and having an experience of atleast five years in the field of elevators or escalators as the case may be or (ii) a diploma in electrical engineering from a recognized Institute and having an experience of at least eight years in the field of elevators or escalators as the case may be.
(c) At least one person possessing a certificate in the trade of electrical or electronics from the Industrial Training Institute or any other recognized Institution and possessing “Wireman competency certificate” issued by Tamil Nadu Electrical Licensing Board and having an experience of at least five years in the field of Lifts or escalators, as the case may be.
(d) Maintenance staff of one Industrial Training Institute electrician, one Industrial Training Institute fitter and one helper for every fifty lifts escalators to be maintained in a year
(e) Clerk/attendant round the clock having the presence in the service station for responding to the complaint calls from the owners. Provided that the employment of such clerk/attendant shall not be necessary during night
hours if facilities for better communication like mobile phone, pager system etc. are available during such hours.
(iv) Shall have a workshop in his own possession within the State of Tamil Nadu equipped with minimum area of 100 square meters with independent facility and telephone and separate power connection of at least 15 HP Such workshop shall be equipped with the following minimum machineries and testing instruments either stationary or portable.
(a) Lathe machine.
(b) Drill machine
(c) Welding machine of 5 kVA or above.
(d) Hacksaw machine
(e) Chain pulley block of 3 tonne capacity.
(f) Standard weight trolley
(g) Clip-on meter for measurement of voltage, current etc.
(h) Tachometer
(i) Megger
(j) Earth tester
Provided that when the authorized person is having his own manufacturing unit within the State of Tamil Nadu, he shall not be required to have a separate workshop but he shall be required to have the minimum machineries and instruments as mentioned above.
(v) shall have necessary safety gadgets, like safety belts and head gears for entire staff engaged in the work of maintenance.
(vi) shall have suitable means of transportation at his disposal for transportation of material.
Provided that a staff register and the relevant records related to maintenance shall be maintained by such person and the same shall be produced for verification as and when directed by the Chief inspector. The specimens of such staff register as well as the guide lines to be followed for maintaining the records of maintenance shall be prescribed by the Chief Inspector.
3Documents to be enclosed herewith along with renewal application:
Every authorization granted under rule 14 shall be valid for two year. The authorization may be renewed on an application made in that behalf to the Chief Inspector along with following documents before three month from the date of expiry of licence.
(a) Certificate of Authorization in original.
(b) A receipted challan in original
(c) A copy of the staff register attested by a Gazetted Officer.
(d) Details of lifts maintained during the validity period of authorisation.
(e) A certificate from any nationalized bank to the effect that the applicant continues to be solvent to the extent of Rupees Five lakhs.
(f) A copy of the application made, if any, for renewal of the registration granted under the Factories Act, 1948.
(g) Updated list of machineries, equipment and testing instruments in possession.
(h) Details of safety gadgets for staff.
(i) Details of vehicles in possession for transportation of materials.
Government of Tamil Nadu
Letter No....
Dated
To
Sub: Permission for * erection of Lift or Escalator * or making additions or alterations of existing Lift or Escalator *at the ....Granted.
*Under sub-section (3) in section 4 of the Tamil Nadu Lifts and Escalators Act,1997 (Tamil Nadu Act 35 of 1997), permission is hereby granted to erect Lift or Escalator * under section 9 of the Tamil Nadu Lifts and Escalators Act,1997 (Tamil Nadu Act 35 of 1997), *permission is hereby granted to make additions or alterations of existing Lift or escalator * at the premises .... owned by .... subject to the provisions of the Tamil Nadu Lifts and Escalators Act,1997 (Tamil Nadu Act 35 of 1997) and the Tamil Nadu Lifts and Escalator Rules, 1997.
The permission shall be valid for a period of six months from the date on which it is granted.
The lift or Escalator* shall not be worked until a licence is granted by the Inspector of Lifts and Escalators for working of the lift or escalator in accordance with rule 4 of the Tamil Nadu Lifts and Escalator Rules, 1997.
Signature-----------------
The Inspector of Lifts and Escalators, Government of TamilNadu
* Strike off whichever is inapplicable.
FORM C (see rule 4 (1))
“forms Form ‘a’ (see Rule 3 ) Application for Permission to Install - a Lift or an Escalator to Make Additions and Alterations to
ToThe Inspector of Lifts and Escalators.
ToThe Inspector of Lifts and Escalators.
ToThe Inspector of Lifts and Escalators.
1
Full Name and Address of the Applicant
2
Contact Number and E- mail id
3(a)
Address of the premises where the Lift or Escalator *is to be* Installed*make additions or alterations
(b)
Approval reference of Urban Local Body concerned for the Building Plan (Copy of approval letter, approved plan and elevation drawings to be enclosed).
4
Whether a licence has been previously granted (details to be given).
5
Type and Make of Lift or Escalator* (A sketch of the erection plans as per rule 3 shall be attached).
6
(a)The rated maximum speed of the Lift;The Maker's or Designer's rated capacity in Weight (in kg).*(b)The rated speed of Escalator (m/sec);The Maker's or Designer's rated capacity (in persons /hr).*
7
The maximum number of passengers in addition to the lift operator which the lift can carry*
8
The total weight of the lift car carrying the maximum load (Weight of car plus maximum allowable load)*
9
The weight of the counter-weight for Lift (kg )*
10
System of roping: (The number, description, weights (kgs) and size (in Sq.mm) of the supporting ropes of the Lift )*
11
Lift *:The depth of the pit from lowest part of the car when at the lowest floor (in mms)Escalator*:The depth of the pit (both upper and lower) (in mms)
12
Details of the construction of the Overhead Arrangement with weight (in kg.) and size (in mms) of beams or any other arrangement *
13
Total Number of landings of the Lift*
14
(a)Angle of inclination of escalator*(b)Vertical rise of the escalator (in mms)(c)Width of the escalator(d) Number of flat steps
15
(a)Type of balustrading in escalator:(b) Height of balustrade
16
Details of(a) hand rails(b) steps treads(c) landing(d)comb plates(e) trusses or girders, Skirting brush(f)step wheel tracks in escalator
17
(a)Drive chain factor of safetywhether all the electrical and mechanical safety devices as per standards provided in the escalator(b) Illumination level provided for comb lights (in lux)
18
Details of fee paid
Date:
Signature of the Applicant.
Encl: 1. Original remitted chalan/e-receipt.
Copy of approval obtained from the local body for the building.
Drawings of Lift or Escalator*Installation (Both Electrical and Mechanical)
* Strike off whichever is inapplicable.
2Grant of Certificate of authorization:
(1) The Chief Inspector may after such enquiries and tests as may be considered necessary grant a certificate of authorization in Form “M’’, in case of lifts and in Form “N’’, in case of escalators set out in this annexure to an applicant who fulfill the above requirements.
(2) The Chief Inspector may after giving an opportunity to the persons authorized under section 10(3) of the Act of being heard, cancel the authorisation, If the person has reason to believe that he -
(i) has violated any condition stipulated in the authorisation; or
(ii) has acted in a manner inconsistent with the intent or the purpose of this Act or the rules made thereunder; or has omitted to act as required under the Act and rules made thereunder or found to be guilty of negligence, incompetence; or
(iii) for any other reason to be recorded in writing.
Notice of Accidents in Lifts or Escalators
To
The Inspector of Lifts and Escalators
The commissioner of Police in the City of Chennai, Madurai, Coimbatore, Salem, Tiruchirappalli, Tirunelveli or Tiruppur and elsewhere to the District Magistrate and such other officer as the Government may, by order, specify in this behalf.
Under Section 13 of the Tamil Nadu Lifts and Escalators Act, 1997 (Tamil Nadu Act 35 of 1997), I/We hereby inform you that an accident has occurred in the operation of *Lifts/*Escalators at the place owned by me/us on -
I/We have discontinued the working of a Lift/Escalator, pending permission of the Inspector to resume the working.
Yours faithfully,
Dated :
Signature of the owner of the Lift/Escalator
* Strike off whichever is inapplicable.
FORM- J (see rule 14)
Notice Intimating the Completion of the Work of Erection of Lift or an Escalator and Application for a Licence to Work the Lift or an Escalator
To
The Inspector of Lifts and Escalators
Sir,
Sub: Erection of Lift or Escalator *at the ....
With reference to your letter No.____dated____ by which permission has been granted to erect a Lift or an Escalator* at the above mentioned premises, I/We have to state that the work of erection of the lift or Escalator* was completed on ____ by Thiru.____.
I/We further request that a licence for working the lift or Escalator* may be granted. The work of erection of the lift or Escalator* has been carried out in accordance with the provisions of the Tamil Nadu Lifts and Escalator Rules, 1997.
A work Completion Report of the manufacturer of lifts or escalators* or Company of the Electrical and Mechanical Engineers, Completion Report of the licensed Electrical Contractor, and copy of Insurance Policy taken by the owner(s) of the Lift or Escalator* covering insurance for the persons using the Lift or Escalator* are enclosed.
Yours faithfully,
Signature of the owner of the lift or escalator*
Encl.: (1) Original remitted chalan/e-receipt.
(2) Work Completion Report of the manufacturer of lifts or escalators* or the Company of Electrical and Mechanical Engineers.
(3) Work Completion Report of the Electrical Contractor.
(4) Copy of Insurance Policy.
* Strike off whichever is inapplicable.
Form D
[See Rule 4 (1)]
To
The Inspector of Lifts and Escalators
Sir,
Sub: Erection of Lift or Escalator*-Submission of Completion Report
We ____ (Name of the manufacturer of Lifts or Escalators*or Company of Electrical and Mechanical Engineers) having undertaken the work of erection of the lifts or escalators at the premises of ---- and having completed the erection of the said lift or escalator *hereby certify that the work of erection of the lift or escalator complies with the provisions of the Tamil Nadu Lifts and Escalator Rules, 1997. We further certify that the erection and testing of the lift or escalator* has been carried out in accordance with the provisions of the Tamil Nadu Lifts and Escalators Act, 1997 (Tamil Nadu Act 35 of 1997) and the Tamil Nadu Lifts and Escalator Rules, 1997 and confirm that the Lift car, motor, controller, ropes, governor and all the systems and components of the Lift have been tested conforming to the Bureau of Indian Standards or relevant International Standards *or the Escalators have been tested conforming to the Bureau of Indian Standards or relevant International Standards.
It is certified that the Building in which the lift or escalator* is erected is structurally sound and stable. We further certify that the lift or escalator * installation is ready for Inspection which is required to be made for the purpose of Issuing a licence under the said Act and the Rules, for working the same.
We undertake the full responsibility of the Installation to be handed over duly to the owner after Inspection and compliance of provisions of the said Act and Rules.
*Details of Lift Installation:
(i) Make of Lift and Serial No.
(ii) Type of Lift
(iii) Type of Control
(iv) Capacity
*Details of Escalator:
(i) Make of Escalator and Serial No ____
(ii) Angle of inclination of Escalator ____
(iii) Width of the escalator
(iv) Vertical rise of the escalator
(v) Rated load
(vi) Rated speed
Yours faithfully,
Signature of the Manufacturer of the lifts or escalators* or the Company of the Electrical and Mechanical Engineers.
Registration certificate No:
Validity:
* Strike off whichever is inapplicable.
FORM E [See rule 4 (1)]
Form of Completion Report from Licensed Contractor for Electrical Works of Lift or Escalator
We report that the electrical installation detailed below has been installed by us and tested and that to the best of our knowledge and belief it complies with the Central Electricity Authority (MSES) Regulations, 2010 as well as the Indian Standard code of practices for electrical installations.
(1) Electrical Installation at
____
(2) Voltage and System supply
(3) PARTICULARS OF WORKS:
(a) MV installation:
Sl.No.
Equipment
Capacity in KW
Voltage
Fed from Distribution Board/Switch Board
(1)
(2)
(3)
(4)
(5)
(b) Lighting load:
N.B.- Additional sheets to be used, if needed, for furnishing details against any items.
(c) Test results:
I. (1)
Insulation resistance for the whole Installation
(2)
Between Phases.
(3)
Between each phase and earth
II. (1)
Resistance of earth electrode for earthing system
(2)
Maximum earthing resistance of Installation
Signature of Supervisor
Name and address
Signature of Electrical Contractor
Name and address
(1) (y)/(x) = (x)/(2) + 1
COMPETENCY CERTIFICATE
ELECTRICAL CONTRACTOR LICENCE
No._
No._
Valid upto____
Valid upto____
Dated ____
Dated____
FORM 'F' [see rules 4(2), 5(2) and 6]
Licence to Work / Renewal of Licence to Work a Lift or an Escalator
(This licence is not transferable or assignable to any person, company, body of individuals or firm. This licence is to be renewed once in three years and must be produced to the Licensing Authority when called for.)
Registration No._
Under sub-section (3) of section 5 of the Tamil Nadu Lifts and Escalators Act, 1997) (Tamil Nadu Act 35 of 1997), Thiru____ are hereby granted / renewed licence to work or cause to be worked or allow the working of the lift or escalator* erected and inspected on____ at the premises No. ____
____ subject to the provisions of the Tamil Nadu Lifts and Escalators Act,1997 (Tamil Nadu Act 35 of 1997) and the Tamil Nadu Lifts and Escalators Rules,1997, the particulars of which are given below:-
The licence shall remain valid from ____ to ____ and is issued, subject to the conditions set out below:-
Particulars
(i) Make of Lift and Serial No.
(ii) Type of Lift
(iii) Type of Control
(iv) Capacity ____
Particulars
(i) Make of Escalator and Serial No ____
(ii) Angle of inclination of Escalator ____
(iii) Width of the escalator ____
(iv) Vertical rise of the escalator ____
(v) Rated load
(vi) Rated speed
Date ____
Inspector of Lifts and Escalators
Date of Inspection Valid from (1) (2)
22
Valid upto (3)
Signature of the Officer
renewing the Licence
(4)
Conditions
(1) The lift or escalator* and its installation shall be worked and maintained in conformity with the provisions of the Tamil Nadu Lifts and Escalators Act, 1997 and the Tamil Nadu Lifts and Escalators Rules, 1997.
(2) If the holder of this licence does not reside in the Town or Village in which the lift or Escalator* has been erected, he shall within one month from the date of this licence appoint an agent, authorized signatory of the licensee who shall be resident in the Town or Village in which the lift or escalator* has been erected. The agent, authorized signatory of the licensee so appointed shall be responsible for the working and maintenance of the lift or escalator *in conformity with the provisions of the said Act and Rules. The name of every such agent, authorized signatory of the licensee shall be communicated to the Inspector of Lifts and Escalators. Any change of agent, authorized signatory of the licensee shall also be similarly communicated.
(3) The holder of this licence, within one month from the date of this licence, appoint a manufacturer of lift or escalator* or a company of Electrical and Mechanical Engineers for the maintenance of the lift or escalator* and shall communicate the same to the Inspector. Any change of the above so appointed shall also be communicated.
(4) The licensee shall produce test reports obtained from the competent person authorized under rule 14 for the lift installation in Form “O” or Form “P” for the escalator installation, at the end of every year from the date of grant or renewal of licence.
(5) No additions or alterations to the lift or escalator *and its installation shall be carried out without previous permission in writing of the Inspector.
(6) The licensee shall not use the lift or escalator *which is not in a safe condition and shall be solely responsible for the safe maintenance of the lift or escalator*, so that the Tamil Nadu Lifts and Escalators Rules, 1997 are always complied with.
(7) If the holder of this licence ceases to have interest in the lift or escalator *installation for which the licence is granted, the licence shall be deemed to be invalid and it shall be returned to the Inspector.
(8) If any direction issued under sub -section (2-A) of Section 11 of the Act has not been carried out, such lift in case is found being used, shall be ordered to be stopped forthwith and sealed by the Inspector.
(9) The insurance policy shall be annually renewed at the end of its validity.
(10) Whoever contravenes any of the provisions of the Act or the Rules made thereunder or the terms and conditions of a permission or of a licence or a direction given by the Inspector or any person appointed under Section 14 of the Act to assist him, shall be punishable with fine which may extend to one thousand rupees and in the case of a continuing contravention with a further fine which may extend to fifty rupees for every day during which such contravention is continued after such conviction.
Application for Renewal of Licence for Working a Lift or an Escalator
The Inspector of Lifts and Escalators,
Sir,
Sub:- Application for renewal of Licence for working the Lift or Escalator * at ____
As required under rule 5(1) of the Tamil Nadu Lifts and Escalators Rules, 1997, I/We hereby apply for the renewal of licence for working the lift or escalator* and the required particulars are furnished below and request that renewal of licence may be granted:-
1.
Full Name and Address of the Applicant
2.
Contact Number and E-mail id:
3.
Address of the place where the lift or escalator has been erected together with the name of the owner thereof.
4.
Details of licence previously granted
5.
Details of fee paid.
6.
Whether a copy of valid Insurance Policy taken by the Owner of the lift or escalator* covering insurance for persons using the lift or escalator* is enclosed.
7.
Whether a copy of Annual Maintenance contract for the lift or escalator is enclosed.
8.
Whether a copy of the test reports issued by the authorised competent person is enclosed.
Yours faithfully,
Signature of the Owner of the lift or Escalator*
Encl: (1) Original remitted Challan/e-receipt
(2) Copy of Insurance Policy.
(3) A copy of Annual Maintenance Contract for the lift
(4) A copy of the Test Report issued by the competent person
(5) The stability Certificate obtained from the registered Structural Engineer for the buildings which are constructed before the formation of Urban Local Body (if applicable)
* Strike off whichever is inapplicable.
FORM H (see rule (6))
Application for Licence for Working an Escalator Erected Prior to the Commencement of the Tamil Nadu Lifts and Escalators Act, 1997
To
The Inspector of Lifts and Escalators,
1. Full name and address of the applicant
2. Name and address of the authorized signatory
3. Address of the place where the Escalator has been erected together with the name of the owner thereof.
4. Date of erection
5. Type of Escalator
6. Name of Manufacturer and Serial Number of Escalator
7. Vertical rise of the Escalator in millimeter
8. The rated speed of the Escalator (m/s)
9. The rated load (in Kilogram) of the Escalator
10. Rated Capacity in persons/hour
11. Angle of inclination of escalator
12. Type of balustrading in escalator
13. Width between balustrades in escalator
14. Details of handrails, steps treads, landing, comb plates, trusses or girders and step wheel tracks in escalator
15. The Factor of safety based on the static loads
16. Whether all the Electrical and Mechanical safety devices are provided as per standards
17. Details of fee paid
Signature of the Owner of the Escalator
Date:
Enclosure: (1) Copy of Insurance Policy taken by the owner of the escalator covering insurance for the persons using the escalator.
(2) Original remitted Chalan
(3) Test Reports obtained from the authorised competent Person
(4) Structural Stability Certificate obtained from registered Structural Engineer for the building where the escalator is installed.