“Notice /Application: An online application through the designated Building Permission Portal of the Housing & Urban Development Department (H&UDD), Government of Jammu and Kashmir, along with AUTO CAD Based building all requisite plans and with all other relevant documents as required, in prescribed digital formats, shall be uploaded by the owner through the empanelled Technical Registered Person for obtaining Building Permission. All communications, scrutiny observations, and approvals issued through the said online portal shall have the same legal validity and enforceability as those submitted or granted through physical means.”
[Signature]
3. Clause 2.6.2 replaced with the following:
Online Auto Scrutiny of Application:
Auto scrutiny system shall:
a) Automatically verify uploaded building and site plans against provisions of the Master Plan / Zonal Plan, Unified Building Bye-Laws, Development Control Regulations, and other applicable norms.
b) Check mandatory parameters including plot size, setbacks, ground coverage, FAR/F.S.I, height restrictions, parking requirements, and permissible land use.
c) Generate a Scrutiny Report highlighting compliance and deviations, if any, for applicant and authority review.
d) In case of any deficiencies, discrepancies, or shortfalls observed during automated scrutiny, the system shall communicate the same online to the applicant through the Building Permission Portal. The applicant shall be required to submit the compliances or rectify the shortfalls within fifteen (15) days from the date of such online intimation.
e) If the applicant fails to respond or submit the required compliances within the stipulated period of fifteen (15) days, the online application shall stand auto-rejected by the system with the provision for revival of application within 90 days, after that the application shall be closed, with liberty to application to submit fresh application.
f) Enable digital submission of revised plans in response to auto-generated observations.
Processing Workflow:
a) Applications passing all automated checks shall be auto-forwarded for digital approval and issuance of building permit by the BPIA.
b) Applications flagged for deviations shall be routed to the respective Town Planning / Building Cell for manual scrutiny and decision.
c) Incomplete/deficient application shall be reverted by the BPIA to the concerned applicant to complete the application and resubmit within a
A
further period of ninety (90) days from the date of such auto-rejection. Failure to do so within this extended period shall result in the permanent rejection of the application, and a fresh application shall be required thereafter in the prescribed manner..”
d) The system shall record all actions and communications in a tamper-proof digital log.
Integration with GIS and Land Records:
The Auto-Scrutiny System shall progressively integrate with GIS based Land Use maps, approved layouts, and online land record databases to ensure site verification and prevention of encroachments or misuse.
Accountability and Transparency:
All auto-scrutiny reports, decisions, and timelines shall be digitally traceable and accessible to applicants to ensure transparency, accountability, and reduction of discretion in plan approval
4. Clause 2.6.3 shall be substituted with the following:
Grant or Refusal of a Building Permit:
1. Automated Decision Process:
After completion of the auto-scrutiny process, the system shall generate a Compliance Report based on conformity of the proposed building plan with the provisions of the Master Plan / Zonal Plan, Unified Building Bye-Laws and Development Control Regulations, 2021 as amended from time to time and other applicable statutory requirements.