Important considerations for the proposed land use zones in the SPA area are as below:
• Major land in the SPA area is under forestland with hilly terrain.
- Some of the private lands at village Jasai, Padeghar and Chanje are also under hilly terrain.
- Private lands at Village Karave are affected by CRZ. The affected portion is proposed under no development zone and the rest of the lands are under the Residential zone.
• Logistics/Warehousing activities at Village Padeghar and Vahal.
• Navi Mumbai International Airport.

• Jawaharlal Nehru Port Trust (JNPT)
• Growth Centres are proposed in the adjoining NAINA SPA area adjoining to Pocket B.
- MIDC (IIA) project adjoining to Pocket B.
• Major Transportation networks passing through the SPA area.
The table below gives the breakup of the proposed land use distribution in the SPA area:
10.5.1 Regional Park Zone (RPZ)
This zone constitutes a major portion i.e. 91.87% of the total SPA area. Navi Mumbai Development plan comprises different zones out of which the Regional Park Zone is a zone in which most of the lands are undeveloped because of hilly terrain and Forest. Regional Park Zone (RPZ) pockets within SPA areas beneficial to preserve dense tree cover and hill tracts. This extensive forest cover in the Thane District of the SPA area around the urban agglomeration shall be conserved according to strict laws, regulations and guidelines. To explore the flora and fauna, inhabiting the forests and urban forest parks, in the Navi Mumbai, Urban forest parks shall be created to provide a thriving habitat for many species of animals while promoting green cover. The myriad attractions of nature in the form of national parks, urban forest parts and exotic ecotourism destinations beckons visitors to spend time in nature and truly rejuvenate, breathing fresh air and witnessing the verdant greenery.
10.5.2 Industrial (Warehousing) Zone
This zone constitutes 1.76% of the total SPA area. Industrial and warehousing activities are observed in villages Padeghar and Vahal. Proposed under Industrial (Warehousing) land use. The SPA area at village Padeghar and Vahal has having locational advantage as it is along JNPT road and MTHL is landing at Village Chirle. The Integrated Logistic Park project is adjacent to Village Padheghar, Jasai, Vahal and Chirle. MMC is also passing through these villages. Once Navi Mumbai International Airport is developed, it is going to trigger the growth of this area.
10.5.3 Residential Zone
This zone constitutes a portion of 1.18% total SPA area. Part of Karave village has plain/tableland. Hence pockets outside the CRZ boundary are considered for development. The residential zone is generally proposed to accommodate the projected population. Also, social amenities and utilities are proposed in it.
10.5.4 No Development Zone

This zone constitutes a portion of 0.87% total SPA area. This portion of the Karave area comes under the CRZ area. As approved by CZMP 2019, the 50 m belt from HTL is considered a “No Development Zone” to protect the environment.
10.5.5 Transportation
The transportation network in the area includes the land that is under reservation for transport-related proposals only. The total area proposed under transportation land use is 2.57% of the total SPA area. The land is under reservation of Multi Modal Corridor (MMC) Virar to Alibaug and part of MTHL road. Alignment of the proposed bullet train and proposed Airoli – Katai road passes through pocket A. Also road widening of existing National Highway in pocket B.
10.5.6 Water Body
One waterbody is seen at the hill of Village Dighe which is known as Mogliche Dam. Mogliche Dam is also known as Khandicha Lake. This is the only water body existing in the SPA area. The area of the water body is approximately 3.66 Ha., which is 0.21% of the total SPA area.
10.5.7 MIDC – IIA Area at Padeghar
MIDC vide its notification no. MIDC/IIA/A21886/2022 dated 19 th January 2022 has notified an industrial area at village Padeghar as the Integrated Industrial area (IIA) and MIDC has become the Special Planning Authority for that Integrated Industrial area (IIA). As per Govt. the notification dates 26 th November 2023 published in the Gazette in which some survey numbers of Padeghar have been included in IIA. Area of survey no. 130/3 (13D/3 new) is changed and ceases the power of CIDCO as SPA as mentioned in this notification.