Sub-regulation (1) of regulation 4 of the principal regulations, shall be substituted by the following, namely:-
“(1) OBPAS: Every person, including Central and State Government Departments and Semi-Government Departments/ Organisations excluding the Defence Ministry, who intends to erect, re- erect or make material/structural alterations (except internal alterations which do not affect the safety of the building) shall obtain a building permit by giving an application to the Aizawl Municipal Corporation through the Online Building Plan Approval System (OBPAS)
i) All the applications for buildings located within Aizawl Municipal Corporation Area shall be submitted through Technical Personnel, who are registered under Aizawl Municipal Corporation.
ii) The Technical Personnel shall make necessary site verification, examine the documents and submit the Application online to AMC along with the Building Plans and documents required as per the AMC Building Regulations, 2012.
iii) On payment of requisite fees etc. the system shall generate instant Building Permit along with approved drawing and forward the same to registered Technical Personnel and the Applicant with
SMS and email alert. The approved drawings and the Building Permit shall be in a downloadable format by the registered Technical Personnel.
iv) In case the proposal is not as per the provisions of the AMC Building Regulations, 2012 and the Master Plan for Aizawl, Vision-2030, the system shall return the same to registered Technical Personnel with email and SMS alert to the applicant with detail.
v) No.of floors completed as per approved permit may be issued Occupancy Certificate for the completed floors."