Outline of hydro-geological Report for obtaining No Objection Certificate for industries
-
Brief about the proposed project giving location details, coordinates, google/ toposheet maps, etc. demarcating the project area.
-
Ground water situation in and around the project area including water level and quality data and maps along with quality issues, if any. In case of mines, ground water conditions in both core and buffer zone should be described.
-
Details of the tubewells/ borewells proposed to be constructed. This includes the drilling depth, diameter, tentative lithological log, details of pump to be lowered, H.P. of pump, tentative discharge of tubewells/ borewells, etc. Locations to be marked on the site plan/ map. Location of proposed piezometers.
[PART II—SEC. 3(ii)]
-
Details of Geophysical studies carried out in and around the project area. Ground water resources computation of the block in which the project falls.
-
Approved Mine plan in case of mines and detailed dewatering plan in case of mine/ infrastructure dewatering projects.
-
Proposed usage of pumped water in case of mining/ infrastructure dewatering projects.
-
Comprehensive assessment of the impact on the ground water regime in and around the project area highlighting the risks and proposed management strategies proposed to overcome any significant environmental issues.
-
Proposed measures for disposal of waste water by industries drawing saline water.
-
Measures to be adopted for water conservation which include recycling, reuse, treatment, etc. This includes the water balance chart being adopted by the firm along with details of water conservation methods to be adopted.
Brief write up along with capacity and flow chart of Sewage Treatment Plants / Effluent Treatment Plants / Combined Effluent Treatment Plants existing/ proposed within the project.
Details of water conservation measures to be adopted to reduce/ save the ground water.
Total water balance chart showing the usage of water for various processes.
- Any other details pertaining to the project.
Annexure V
Format of the Report on ground water conditions (for mining projects)
| Introduction |
|---|
| Project description |
| Background |
| Objectives and scope |
| Regional setting |
| Location |
| Landuse |
| Climate |
| Topography and drainage |
| Geology –Regional and Local |
| General Hydrogeology (aquifer types, aquifer depth, zone tapped etc.) |
| Groundwater condition (In core and buffer zones) |
| Spatial and temporal variations in water levels Groundwater quality (Shallow and deep aquifer) |
| Impact of groundwater extraction on local groundwater |
| Hydrograph of water level/piezometer in monitoring wells |
| Trend analysis of historical water levels Flow net analysis (groundwater flow direction) |
| Year wise/ bench wise mine dewatering computation as per approved mine plan |
| Conclusions |
55