It has been observed that ground water in and around polluting industries like Tannery, Slaughter Houses, Dye, Chemical, Coalwashery, other hazardous units, etc., is polluted. In order to prevent further deterioration of ground water quality, it is essential to take all necessary measures for well head protection. All industries/ projects falling under this category are hereby directed to follow the under mentioned procedure both for existing and new category.
-
No tube well/ bore well / dug well should be constructed in the vicinity of the processing unit. Tube well/ bore well should be constructed at the place which is hygienically maintained.
-
Only Mild Steel pipe should be used for assembly/ casing and PVC (Poly Vinyl Chloride) or similar pipes should not be used. The tube well/ bore well having PVC or similar pipes should be abandoned and filled back.
-
Around the tube well/ bore well, RCC (Reinforced Concrete Cement) grouting of 3 meters (length) x 3 meters (width) x 2 meters (depth) must be provided. The pipe of the tube well/ bore well must be raised 1 meter above ground level (1 magl). The tube well/ bore well must be surrounded by RCC wall of 0.5 meter height and 1.5 meter depth to prevent any surface contamination to enter the constructed tube well/ bore well. Plan/Sectional diagram is enclosed for reference (Appendix 1 and 2).
-
The tube well/ bore well must be fitted with NRV (Non Return Valve) in order to ensure that the constructed tube well/ bore well is exclusively used for abstraction of ground water only.
-
At no point of time there should be any injection of any water or fluid into the constructed tube well/ bore well/ Piezometer.
-
The industries/ projects under this category should not implement any recharge measures within the plant premises.
-
Any tube well/ bore well located/ constructed in the vicinity of STP (Sewage Treatment Plant) or ETP (Effluent Treatment Plant) should be abandoned and filled back.
-
The piezometer to be constructed for monitoring purpose should follow the same procedure as that for tube well/ bore well for such industries/ projects.
[PART II—SEC. 3(ii)]
Plan/ Sectional diagram showing well head protection
Appendix 1

PLAN

SECTION
53
Plan/ Sectional diagram showing well head protection
Appendix 2