Notwithstanding anything to the contrary, as contained in this Code, in order to ensure the structural safety measures in high risk buildings, the provisions laid down hereunder shall be mandatory for the purpose of obtaining various approvals for building plan, undertaking construction, occupancy of a building and its post construction maintenance.
10.2.1 Empanelment of Structural Engineer, Proof Consultant, Supervising Engineer and Geo Technical Engineer:
a. For building of height more than 70m, the Form BR-I as well as Form BR-V (A2) shall also be signed by Geotechnical Engineer, having a Masters degree in Geotechnical Engineering from a recognized institution and having atleast 10 years of professional experience in the said field.
b. structural engineer, proof consultant, supervising engineer and geotechnical engineer shall be empanelled through an online application. The eligibility criteria in this regard is laid down at Appendix-A.
c. 57[Committee shall be constituted for such empanelment by the Government from time to time].
. an application for empanelment shall be accompanied by the documents as follows:
i. identification card (Aadhar card/Passport/PAN card)
ii. qualification degree (As per eligibility)
iii. detail of experience alongwith list of projects carried out.
iv. undertaking regarding experience declared by the applicant in point no. iii. above
57Substituted vide Memo No.Misc-2339-Loose-ULB-7/19/2023-2TCP Dated 04.12.2023
[88]
v. undertaking that the applicant has not been blacklisted from any association/organization.
e. on receipt of application for such empanelment, the committee shall scrutinize the same and assign a specific date and time to the applicant for physical verification of the documents. The committee shall have the discretion to call the applicant for personal interview.
f. the empanelment of structural engineer, proof consultant, supervising engineer and geotechnical engineer shall remain an ongoing process.
g. after approval of the committee, a unique empanelment ID shall be assigned to each applicant and this unique ID shall be applicable for all future requests for approval of building plans and occupation certificate.
10.2.2 Third party inspection during Construction:
Third Party Inspection Agencies (TPIA) working in the field shall be empanelled to ensure desired quality of construction and structural safety.
a. TPIAs shall be empanelled after following the process of advertisement in leading newspapers and publication on the departmental website.
b. the minimum eligibility criteria for empanelment as Third-Party Inspection Agencies (TPIA) shall be as follows:
i. be a member of Indian Association/Society of Structural Engineers or registered with municipal corporations/ CPWD/ State PWD or other similar Government organisations.
ii. possess at least 05 years of experience in the field of consultancy and conducting structural audit of high rise buildings.
iii. have at least two empanelled structural engineers with atleast 10 years’ experience as structural engineer.
iv. the company must have clear track record and not be blacklisted from any organization/Government department/authority.
[89]
c. an application for empanelment as TPIA shall be accompanied by the documents as follows:
i. registration ID of the firm/company
ii. PAN card of the firm/company alongwith ITR of last three years.
iii. address Proof of the company
iv. list of technical staff alongwith details of their qualification.
v. detail of Experience alongwith list of projects carried out.
vi. authorisation letter/board resolution from the company.
vii. undertaking that the applicant has not been blacklisted from any association/organization.
d. the scope of work for such TPIA shall comprise of following but not limited to:
i. scrutinizing/verifying drawings and specifications
ii. ensure that execution of work is undertaken at site in accordance with architectural as well as structural drawings.
iii. reporting of on-site inspections periodically.
iv. inspection/testing and sampling of quality of material, water, workmanship, safety parameters at construction site etc.
v. performing final inspections upon building completion and certify that the building is safe to occupy before grant of occupation certificate.
e. the firms/companies intending to be empanelled shall apply online alongwith the requisite documents. The constitution of empanelment committee as envisaged for empanelment of structural engineer, proof consultant, supervising engineer and geotechnical engineer under subcode 10.2.1 above shall be adopted.
on receipt of application, the committee shall assign a specific date and time to the applicant for physical verification of documents. The committee shall have the discretion to call the applicant for personal interview.
g. after approval of the committee, a unique empanelment ID shall be assigned to the TPIA and this unique ID shall be applicable for all future third-party inspections.
10.2.3 Action against complaints on quality of construction:
Empanelment of ‘Fact Finding Agency’ (FFA) shall be undertaken to carry out the inspection of site on the complaints referred by competent authority and submit a clear fact-finding report within 15 days as to whether detailed ‘Structural Audit’ is required or not.
a) the empanelment of FFAs shall follow the same procedure as that prescribed for TPIA. The FFAs shall be awarded assignments either on rotation or as per the procedure finalized by the competent authority in this regard.
b) the FFA shall give a clear report on whether the damage requires maintenance work or an extensive structural audit is required.
c) the payment to FFAs may be made from the 1% labour cess fund as maintained and operated by the respective competent authority.
d) the FFAs shall recommend the remedial measures to be carried out by the developer company immediately.
10.2.4 Post construction Structural Audit:
After receipt of recommendation of the FFA regarding necessity of detailed structural audit, the structural audit shall be carried out by one of
[91]
the empanelled Structural Audit Agency (SAA) to perform structural audit of the buildings post construction.
a. The eligibility for empanelment of Third-Party SAA and the documents required would be same as for TPIA as prescribed in sub-code 10.2.2 above.
b. the scope of work for such TPIA shall comprise of following but not limited to:
i. structural audit shall be carried out as a qualitative assessment in accordance with latest guidelines of Indian Society of Structural Engineers. Visual health inspection of buildings covering internal, external and common areas, marking in floor plans all the visible defects, deterioration and quantification.
ii. assessment of damages of RCC members through NDT (Non-Destructive Testing).
iii. finding the probable causes of damages, seepage/leakages and status of external plumbing installations.
iv. preparation of detailed report based on visual inspection, NDT, suggesting/ phasing out priority wise repair/ remedial and retrofitting measures.
v. detailed inspections of the quality of material, workmanship etc.
vi. scrutinizing/verifying drawings and specifications
vii. field testing and sampling of construction material etc.
viii review of structural drawings to evaluate the structural stability and safety of the building constructed as per current circumstances.
ix. estimation of structural capacity on the basis of the tests (Non-Destructive Evaluation Tests).
x. Analysis of observation and test for assessment of mechanism and cause of damage, distress and durability requirements.
xi. tests to confirm reinforcement locations, types of reinforcement, bar diameters and their mechanical properties, strength of existing concrete and other properties for reinforced concrete structures.
[92]
xii. for load bearing masonry constructions, appropriate testing be done to evaluate the masonry strength.
xiii. analysis of test results to establish statistical equivalent material properties.
xiv. limits of faulty construction.
xv. structural audit agency shall give clear recommendation on the safety of the building, possible remedial and retrofitting steps.
c. for empanelment as SAA, the procedure prescribed for TPIA shall be followed.
d. the SAA shall prepare detailed report based on visual inspection, Non-Destructive Testing (NDT), suggesting/ phasing out priority wise repair/ remedial and retrofitting measures.
e. the agency carrying out the structural audit shall give clear recommendation on the safety of the building, possible remedial and retrofitting steps.
f. the cost of structural audit shall be borne by developer company or the Residents Welfare Association (RWA), as applicable.
10.2.5 Alteration in building by allottees/RWA
drawings and structural drawings to the respective allottee as well as to the RWA on grant of possession for an apartment and handing over of the colony to RWA, as the case may be. The drawing may be in soft/hard copy.
b. No alteration shall be carried out by the allottees/RWA from the approved as built drawings and structural drawings. Any alteration, without damaging the load bearing structural components, after occupation can be carried out only with prior
[93]
approval/recommendation of empanelled structural engineer engaged by Resident Welfare Association/Developer Company. In case of alteration, allottee shall be solely responsible for any structural damage to the building.
c. The RWA shall be responsible for maintaining a record of various works got carried out by different allottees and the supervising Architect and Structural Engineer on whose advise such renovation/ refurbishment of the apartment is carried out.
d. The RWA shall also be responsible for getting structural audit conducted for a building which is more than 30 years old. Further, periodical structural audit may be got conducted based on the advice received from SAA in this regard. The cost of all such structural audits shall be borne by the respective RWAs.]
58[10.3 Procedure for design and review of Code Exceeding Tall Buildings The procedure for design and review of Code Exceeding Tall Buildings alongwith list of Engineers and consultants on Expert Review Panel (ERP) for such buildings shall be duly notified and amended from time to time, as per requirement of Bureau of Indian Standards and National Building Code.]
58Inserted/amended vide Misc-2339-Loose-Vol-I/2024/7/16/2024-2TCP Dated: 05.08.2024