1. PROJECT DETAILS
A. Project Name
B. Survey No./ Village/ Co-ordinates
C. District
D. State
E. Whether the proposal is for (Select relevant field)
(i) Fresh Clearance under CRZ
(ii) Amendment to an already issued CRZ clearance
(iii) Extension of validity of an already issued CRZ clearance
F. Name of the Applicant
G. Address of the Applicant
H. Contact details (Telephone nos. and e-mail address)
I. Cost of the project (Rs in crores)
2. BENEFITS OF THE PROJECT
A. Details of Project Benefits
B. Employment Likely to be Generated (Yes/No)
If Yes
(i) Total Manpower Requirement
(ii) Permanent Employment (Numbers)
(iii) Temporary Employment (Numbers)
(iv) Temporary Employment- During Construction (Numbers)
(v) Temporary Employment- During Operation (Numbers)
3. DESCRIPTION OF THE PROJECT UNDER CONSIDERATION (Select the Category of the project):
A. Resort / Buildings / civic amenities
(i) Total area/Built-up area (in sqm.)
(ii) Height of structure
(iii) FSI ratio
(iv) Name of concerned town planning authority/ Panchayat etc.
(v) Details of provision of car parking area
B. Coastal Roads / Roads on Stilt
(i) Area of land reclamation
(ii) Estimated quantity of muck/earth for reclamation
(iii) Traffic carrying capacity
(iv) Dimensions of road
C. Pipelines from thermal power blow down
(i) Length of pipeline
(ii) Length traversing CRZ area
[PART II—SEC. 3(i)]
(iii) Depth of excavation
(iv) Width of excavation
(v) Length of pipeline from seashore to deep sea
(vi) Depth of outfall point from surface of sea water
(vii)Temperature of effluent above ambient at disposal point
D. Marine Disposal of Treated Effluent through pipelines
(i) Location of intake/ outfall
(ii) Depth of outfall point
(iii) Length of pipeline
(iv) Length traversing CRZ area
(v) Depth of excavation
(vi) Width of excavation
(vii) Length of pipeline from shore to deep sea/creek
(viii) Depth of outfall point from surface of water
(ix) Depth of water at disposal point
(x) BOD, COD, TSS, oil and grease, heavy metals in the effluent
E. Facility for storage of goods/chemicals
(i) Name of chemical
(ii) End use of the chemical
(iii) No. of tanks for storage
(iv) Capacity of tanks
F. Offshore structures
(i) Exploration or development
(ii) Depth of sea bed
(iii) No. of rigs
(iv) No. of platform
(v) Details of group gathering stations
G. Desalination Plant
(i) Capacity of desalination
(ii) Total brine generation
(iii) Temperature of effluent above ambient at disposal point
(iv) Ambient salinity
(v) Disposal point
H. Mining of atomic minerals
(i) Capacity of mining
(ii) Type of mineral to be extracted
(iii) End use of the mineral
(iv) Government order for mining lease/exploration and approved mining plan details
(v) Extent of mining lease area
53
I. Sewage Treatment Plants
(i) Capacity
(ii) Total area of construction
(iii) Compliance of effluent parameters as laid down by cpcb/spcb/other authorised agency
(iv) Whether discharge is in sea water/creek?
If yes
Distance of marine outfall point from shore/from the tidal river bank
Depth of outfall point from sea water/river water surface
• Depth of seabed/riverbed at outfall point
J. Lighthouse
(i) Total ground area of foundation/platform
(ii) Height of the structure
K. Wind Mills
(i) Capacity (MW)
(ii) Height of the windmill
(iii) Diameter of the windmill
(iv) Length of blade
(v) Speed of rotation
(vi) Transmission lines (overhead or underground)