Sub-rule (1) of rule 46 of the Principal rules shall be substituted with the following –
"The maximum permissible ground coverage for a building of any type of uses shall not be more than 70%.
Provided that plot abutting at least 3 sides with roads of minimum 5m width and used for Industrial or Commercial use may have Ground Coverage of 100%."