| S.NO | EIA STRUCTURE | CONTENTS |
|---|
| 1. | Introduction | • Purpose of the report • Identification of project & project proponent • Brief description of nature, size, location of the project and its importance to the country, region • Scope of the study - details of regulatory scoping carried out (As per Terms of Reference) |
| 2. | Project Description | • Condensed description of those aspects of the project (based on project feasibility study), likely to cause environmental effects. Details should be provided to give clear picture of the following: • Type of project • Need for the project • Location (maps showing general location, specific location, project boundary & project site layout) • Size or magnitude of operation (incl. Associated activities required by or for the project • Proposed schedule for approval and implementation • Technology and process description • Project description. Including drawings showing project layout, components of project etc. Schematic representations of the feasibility drawings which give information important for EIA purpose • Description of mitigation measures incorporated into the project to meet environmental standards, environmental operating conditions, or other EIA requirements (as required by the scope) • Assessment of New & untested technology for the risk of technological failure |
| 3. | Description of the Environment | • Study area, period, components & methodology • Establishment of baseline for valued environmental components, as identified in the scope • Base maps of all environmental components |
| 4. | Anticipated Environmental Impacts&Mitigation Measures | • Details of Investigated Environmental impacts due to project location, possible accidents, project design, project construction, regular operations, final decommissioning or rehabilitation of a completed project • Measures for minimizing and / or offsetting adverse impacts identified • Irreversible and Irretrievable commitments of environmental components • Assessment of significance of impacts (Criteria for determining significance, Assigning significance) • Mitigation measures |
| 5. | Analysis of Alternatives (Technology & Site) | • In case, the scoping exercise results in need for alternatives: • Description of each alternative • Summary of adverse impacts of each alternative • Mitigation measures proposed for each alternative and • Selection of alternative |
| 6. | Environmental Monitoring Program | • Technical aspects of monitoring the effectiveness of mitigation measures (incl. Measurement methodologies, frequency, location, data analysis, reporting schedules, emergency procedures, detailed budget & procurement schedules) |
| 7. | Additional Studies | • Public Consultation • Risk assessment • Social Impact Assessment. R&R Action Plans |
| 8. | Project Benefits | • Improvements in the physical infrastructure • Improvements in the social infrastructure • Employment potential -skilled; semi-skilled and unskilled • Other tangible benefits |
| 9. | Environmental Cost Benefit Analysis | If recommended at the Scoping stage |
| 10. | EMP | • Description of the administrative aspects of ensuring that mitigative measures are implemented and their effectiveness monitored, after approval of the EIA |
| 11 | Summary & Conclusion (This will constitute the summary of the EIA Report ) | • Overall justification for implementation of the project • Explanation of how, adverse effects have been mitigated |
| 12. | Disclosure of Consultants engaged | • The names of the Consultants engaged with their brief resume and nature of Consultancy rendered |