(See section 11)
Fire and Emergency Service Fee Structure
- The Fire and Emergency Service Fee shall be levied as indicated in TABLE given below as per square meter of the built up area for the various categories of the building in accordance to percentage of the Annual Statements of Rates (ASR) as published under the provisions of the Maharashtra Stamp (Determination of True Market Value of Property) Rules, 1995 made under the Maharashtra Stamp Act (LX of 1958).
TABLE
| Sr. No. | Height of the Building in meters | Percentage of the Annual Statement of Rates (ASR) | |||
| Residential | Institutional | Commercial | Industrial | ||
| 1 | Building upto 45 | 0.25% | 0.50% | 0.75% | 0.75% |
| 2 | Building above 45 | 0.50% | 0.75% | 1.00% | 1.00% |
- The categorization of the occupancies in paragraph 1 above shall be as categorized in Part 4 of the National Building Code of India, regarding Fire and Life Safety, which are as follows :—
(a) “Residential Building” means Residential Occupancies as mentioned in Group A of Part 4 of the said Code except Sub-Groups A-5 and A-6 thereof, viz. Lodging, Boarding, Dormitories, Apartment, Multi-level car parking and Mechanized Automated Car Parking.
(b) “Institutional Building” means Educational Occupancies as mentioned in Group B of Part 4 of the said Code and Institutional Occupancies in Group C of Part 4 of the said Code, viz. School, College, University, Hospital, Nursing Home, etc.
(c) “Commercial Building” means Occupancies as mentioned in Sub-Groups A-5 and A-6 of Part 4 of the said Code and Assembly Occupancies in Group D of Part 4 of the said Code, Business Occupancies in Group E of Part 4 of the said Code and Mercantile Occupancies in Group F of Part 4 of the said Code, viz. Hotels, Eateries, Malls, Multiplex, Theatres, Shops, etc.
(d) “Industrial Building” means Industrial Occupancies as mentioned in Group G of Part 4 of the said Code, Storage Occupancies in Group H of Part 4 of the said Code (excluding Multi-level car parking) and Hazardous Occupancies in Group J of Part 4 of the said Code.
Notes :— The fee for the above classification of the building shall be calculated as under :—
-
The fee after computing the necessary percentage of the ASR shall be multiplied by the built up area of the building under consideration for necessary approval.
-
For the purposes of assessment of fee, the built-up area shall be gross built-up area, which includes area of basement, easements, stilts, podium, staircases, lifts, lobbies, passages, balconies, cantilever portions, service floors, refuge areas, etc., as shown in the building plan certified by the Architect and submitted to the Authority alongwith the application for permission for construction of a building. The built-up area to be calculated for this purpose will have no relation with the floor space index or the built-up area calculated in any other manner.
-
The fees to be calculated shall be taken from lowest level to the last livable floors and not slabwise while determining height of the building as indicated in TABLE.
-
For the purposes of assessment of fee, the Annual Statement of Rates published under the provisions of the Bombay Stamp (Determination of True Market Value of Property) Rules, 1995 are the building construction rates issued by the Department of Registration and Stamps, Government of Maharashtra.
-
No fee shall be levied for the building identified as Sub-Groups A-2 and A-4 below 15 meters occupancies as per Part 4 of the National Building Code of India, Part 4 and for all those buildings identified in section 15 of the Act.]